Los Angeles
Pool demolition contractor

(213) 414-7474
LA Pool Demolition Service: Reclaim Your Backyard. The Right Way

San Diego Pool Demolition Service: Reclaim Your Backyard. The Right Way.

For over 20 years, MVM has helped hundreds of the whole county homeowners get their yard back. We're fully licensed, insured, and guarantee a hassle-free process from start to finish.

LA Pool Demolition Service PoolLA Pool Demolition Service
  • Family-Owned & Operated

  • Upfront Pricing Guarantee

  • Projects Done in ~4 Days

  • Licensed & Fully Insured

Get Free Estimate Today!

Details for a For a More Accurate Estimate (Optional): Pool’s Square Feet, Demolition Type, Property Access

Thank you!
Your message has been submitted
Oops! Something went wrong while submitting the form.

Our Recent Projects Done near you

  • Featured Project

    Partial Demolition

    Aguora Hills, CA

  • Featured Project

    Partial Demolition

    San Gabriel, CA

  • Featured Project

    Complete Demolition

    Hacienda Heights, CA

  • Featured Project

    Partial Demolition

    Escondido, CA

  • Featured Project

    Partial Demolition

    Aguora Hills, CA

  • Featured Project

    Partial Demolition

    Glendale, CA

  • Featured Project

    Partial Demolition

    Inglewood, CA

  • Featured Project

    Partial Demolition

    Los Angeles, CA

  • Featured Project

    Partial Demolition

    Pasadena, CA

  • Featured Project

    Partial Demolition

    Los Angeles, CA

  • Featured Project

    Partial Demolition

    Los Angeles, CA

arrowarrow

What Our Recent Clients Have to Say About Us

Our Swimming Pool Demolition Services

  • Partial Demolition

    • Recommended for landscaping purposes

      If you are planning on installing pavers, concrete, or grass, removing your pool partially can save you time and money.

    • Top portion of the pool shell Removal

      This method includes a partial demolition of the top portion of the pool shell. The pool site is backfilled, compacted, and graded according to city requirements.

    Featured Project
  • Complete Demolition

    • Recommended for future construction

      If you are planning on building a structure on top of the location of the pool.

    • Full removal of your inground pool

      Concrete is demolished and hauled away while the pool site is backfilled, compacted, and graded according to city

    Featured Project
  • Free Pool Demo Permit Processing Included

    • Permits can be a hassle. 
Let us take care of It.

      Our swimming pool demolition service includes free permit processing for any city. The cost of the permit itself is not included and must be paid by the customer. This fee can vary between $0 and $1,000 depending on the location.
Timeframe: Varies according to location.

How much does it
cost to remove my pool?

  • Full Access

    (More than 6 ft.)

  • Full Access

    (More than 6 ft.)

Partial demolition cost Complete demolition cost
Starts at Timeframe
$10,500 3-4 days
$12,500 5-7 days
Starts at Timeframe
$17,500 4-6 days
$19,500 $19,500

Factors That Affect Pool Demolition Cost

  • Accessibility

    Machinery needs room to maneuver. Entrances narrower than six feet or obstacles like fences and playsets can increase costs by delaying job completion.

  • Type of Demolition

    Partial demolition is meant for non-building purposes and is cheaper than a complete demolition since it takes less time and less material is hauled away.

  • Pool Design

    The price will vary according to the size and design of the swimming pool. Custom shapes, built-ins, and other additional structures might increase costs. Pool accessories need to be removed before the job starts.

arrowarrow

What's included in a pool demolition service?

Video preview
    • 01

      At-home estimator visit

      Our estimator will schedule a virtual or in-person meeting to review cost factors: pool size, access, and demolition type. Have measurements ready!

    • 02

      Free custom estimate

      Within 48 hours, you’ll get a detailed estimate with no hidden fees, clearly showing what and when you’ll pay. We’re here for any questions.

    • 03

      Free permit processing

      Getting a pool demolition permit can be tedious with all the rules and regulations. We’ve mastered the process, so let us handle it!

    • 04

      Water pumping

      Once we schedule a start date, we’ll arrive a few days before to take out all the water from your swimming pool and spa.

    • 05

      Draining Holes

      Only For Partial Demolition)
We drill multiple holes to prevent water buildup, ensuring the filled-in pool remains stable after rainfall.

    • 06

      Inspecting Drainage Holes

      (Only For Partial Demolition)
After drilling drainage holes, the city will inspect each one to ensure proper placement and size for safety and stability.

    • 07

      Pool demolition + backfill

      We’ll remove your inground pool based on the demolition type and timeframe. You’ll be informed at every step of the process.

    • 08

      External Clean Up

      After demolition, our team conducts a thorough clean-up, removing debris and restoring the area to a safe, tidy condition for future projects.

    • 09

      Schedule Final Inspection

      With your swimming pool removed and the final earthwork done, we will perform a site clean-up of the dirt and construction debris remaining.

Get a Free Estimate From Pool Demolitions Pros!

Get a Free Estimate From Pool Demolitions Pros!

Our specialized pool demolition services extend across the entire Los Angeles County, California, leaving no city or area unserved.

Get Free Estimate Today!

Details for a For a More Accurate Estimate (Optional): Pool’s Square Feet, Demolition Type, Property Access

Thank you!
Your message has been submitted
Oops! Something went wrong while submitting the form.

Got more questions about
your pool demo project?

  • How Long Do Permits Take?
    • Depending on the method chosen, it can take between 2 and 6 days. This timeframe does not include the permit process which can take up to 2-4 weeks but in some cases, it’s over the counter depending on the city.

  • How Much Do Permits Cost?
    • For a partial demolition permit costs range from $0 to $500. For a complete demolition prices start at $1,000.

  • Will I Need to Have My Property Inspected Before?
    • In some cases, a property inspection may be necessary before the swimming pool can be demolished. This is to ensure that there are no utility lines or other obstacles that could be damaged during the demolition process

  • How Long Does Demolition Take?
    • The length of time it takes to demolish a swimming pool can vary depending on factors such as the size of the pool and the complexity of the demolition, but it typically takes between 3-7 days.

  • After Hire, When Do You Start?
    • We will first wait for permit issuing, then after permits are issued we will book you in our schedule immediately.

  • Is There Any Property Damage After?
    • We will take all necessary precautions but some minimal damage might occur. We will be utilizing heavy equipment therefore tire marks, sprinkler damage, and grass loss are damages that could happen.

  • What Are My Payment Methods?
    • Cash, Checks, Credit Debit cards (3.4% charge), BTC & ETH (5% discount).

  • Do You Offer Financing Options?
    • No, we don’t finance or accept payment plans but we can recommend third-party financing options.

  • Are You Licensed?
    • Yes, we are licensed, bonded, and insured to provide pool demolition services in the state of California.

We Also Offer These Services

  • Turf
  • Firepits
  • Barbecues
  • Concrete
  • Pavers
arrowarrow